GERMANY, FEDERAL REPUBLIC OF 29 AUG 1980 FLITE DOCUMENT NO. 8100133

AGREEMENT EXECUTED AUGUST 29, 1980; EFFECTIVE AUGUST 29, 1980.

AUGMENTATION OF THE FOURTH ALLIED TACTICAL AIR FORCE (FOURATAF) AIR DEFENSE GROUND ENVIRONMENT (ADGE) DURING THE INSTALLATION OF THE GERMAN AIR DEFENSE GROUND ENVIRONMENT (GEADGE). TERMINATION WILL COINCIDE WITH ACCEPTANCE OF THE GERMAN AIR DEFENSE GROUND ENVIRONMENT (GEADGE) SYSTEM.

AGREEMENT BETWEEN THE COMMANDER-IN-CHIEF, UNITED STATES AIR FORCES IN EUROPE (USAFE) AND THE FEDERAL MINISTER OF DEFENSE OF THE FEDERAL REPUBLIC OF GERMANY FOR THE AUGMENTATION OF THE FOURATAF AIR DEFENSE GROUND ENVIRONMENT DURING INSTALLATION OF THE GERMAN AIR DEFENSE GROUND ENVIRONMENT (GEADGE)

IN ORDER TO MEET COMFOURATAF'S MINIMUM MILITARY REQUIREMENT FOR AN INTEGRATED AIR DEFENSE SYSTEM DURING THE TRANSITION FROM THE 412L AIR WEAPONS CONTROL SYSTEM (AWCS) TO GEADGE, TO CONTINUE BINATIONAL COOPERATION IN THE FOURATAF AIR DEFENSE GROUND ENVIRONMENT (ADGE), AND TO FULFILL CERTAIN RESPONSIBILITIES OF THE 1954 BONN.

CONVENTIONS AND THE 1959 SUPPLEMENTARY AGREEMENT, THE ABOVE NAMED PARTIES HAVE AGREED AS FOLLOWS:

ARTICLE 1

1. DURING PLANNED OUTAGES OF THE STATIC CONTROL AND REPORTING CENTERS (CRCS) NOW COMPRISING THE 412L AWCS, USAFE WILL PROVIDE AT LEAST ONE FULL 407L CONTROL AND REPORTING POST (CRP) (SEE DEFINITIONS IN ANNEX A), IN SUSTAINED OPERATION, IN SUPPORT OF THE FOURATAF AIR DEFENSE SYSTEM. THE US FACILITIES PROVIDED FOR THIS TRANSITION PERIOD ARE OF A TEMPORARY NATURE AND WILL, IN INSTANCES, NOT MEET ESTABLISHED CRITERIA IN ALL RESPECTS. THE MOBILE 407L CRP IS NOT EXPECTED TO BE A FULL REPLACEMENT FOR THE STATIC CRC. THE OPERATIONAL SHORTFALLS HAVE BEEN BROUGHT TO THE ATTENTION OF THE RESPONSIBLE AIR DEFENSE COMMANDERS WHO RECOGNIZE THE LIMITATIONS.

2. IN NO INSTANCE WILL ARRANGEMENTS MADE FOR OR DURING THIS AUGMENTATION BE CONSTRUED AS OPERATIONAL REQUIREMENTS FOR LATER CONSIDERATION; NOR WILL THEY PREJUDICE EARLIER REQUIREMENTS UNLESS SPECIFICALLY STATED.

3. THE MANNING OF THE CRP WILL BE SUPPLEMENTED BY PERSONNEL AS DEFINED IN ANNEX B TO THIS AGREEMENT.

4. THE SCHEDULE OF PLANNED AUGMENTATION WILL BE:

A. FROM 1600Z, 1 SEPTEMBER 1980, UNTIL PROVISIONAL SITE ACCEPTANCE (PSA) OF CRC BOERFINK THE CRP OF THE 603 TACTICAL CONTROL SQUADRON (TCS) AT MEHLINGEN, GE WILL OPERATE 24 HOURS PER DAY IN ACCORDANCE WITH THE RELATIONSHIPS AND RESPONSIBILITIES DESCRIBED IN THIS AGREEMENT.

B. A SECOND AUGMENTATION PERIOD WILL BE IMPLEMENTED AS FOLLOWS. ON CLOSURE OF CRC MESSTETTEN ON OR ABOUT 15 FEBRUARY 1982 THE CRP OF THE 602 TCS AT TUERKHEIM, GE WILL ASSUME AUGMENTATION RESPONSIBILITIES FROM THE 603 TCS. THIS AUGMENTATION WILL CONTINUE UNTIL PSA OF CRC LAUDA.

ARTICLE 2

1. COMMAND AND CONTROL RELATIONSHIPS DURING THIS AUGMENTATION WILL BE IN ACCORDANCE WITH THE MEMORANDUM OF UNDERSTANDING FOR CENTRAL REGION TACTICAL CONTROL SYSTEM INTEGRATION.

2. ALL AUGMENTATION PERSONNEL, INCLUDING BUNDESWEHR AND UNITED STATES (US) WILL BE OPERATIONALLY RESPONSIBLE TO THE USAF TACTICAL CONTROL SQUADRON COMMANDER. WITHIN THE AREA OF THE SITE, ALL PERSONNEL SHALL FOLLOW THE INSTRUCTIONS GIVEN BY THE SITE COMMANDER. THE SENIOR BUNDESWEHR AND US REPRESENTATIVES WILL EACH BE RESPONSIBLE FOR THE DISCIPLINE AND ORDER OF PERSONNEL WITHIN THEIR CONTINGENT AND WILL BE ADMINISTRATIVELY RESPONSIBLE WITHIN THEIR OWN CHAINS OF COMMAND.

ARTICLE 3

1. WHILE AUGMENTING THE ADGE, THE 407L CRP WILL BE RESPONSIBLE FOR THE FOLLOWING FUNCTIONS:

A. TWENTY FOUR HOUR SURVEILLANCE OF THEIR AREA OF RESPONSIBILITY AS ASSIGNED BY ALLIED SECTOR THREE.

B. CONTROL OF ACTIVE AIR DEFENSE MISSIONS AS ASSIGNED BY THE APPROPRIATE AIR DEFENSE COMMANDER.

C. WEAPONS ASSIGNMENT FUNCTIONS, INCLUDING SCRAMBLE EXECUTION, AS REQUIRED.

D. CONTROL OF ASSIGNED SAM FORCES AS DIRECTED BY ALLIED SECTOR THREE. THE FACILITIES FOR A MCC WILL BE PROVIDED BY THE TCS; IT WILL BE MANNED EITHER BY US OR 2ND (GE) AIR DIV PERSONNEL.

E. CROSS-TELL OF THE AIR SITUATION TO THE REMAINDER OF THE ADGE AS DIRECTED BY ALLIED SECTOR THREE AND IAW CURRENT DIRECTIVES. WITHIN THE TERMS OF THIS AGREEMENT, THE AUGMENTING CRP WILL NOT BE REQUIRED TO PROVIDE AN INTERFACE WITH NATO GROUND ENVIRONMENT OUTSIDE OF ALLIED SECTOR THREE'S AREA OF RESPONSIBILITY.

F. MAINTENANCE OF THESE OPERATIONAL CAPABILITIES IAW PROCEDURES ESTABLISHED BY COMFOURATAF CI 90-13 AND SOC-3 DIRECTION. US PERSONNEL WILL MAINTAIN US GROUND EQUIPMENT PROVIDED FOR THE AUGMENTATION. IF GERMAN AIR FORCE (GAF) EQUIPMENT IS PROVIDED TO PERFORM CERTAIN NATIONAL FUNCTIONS, GAF WILL MAINTAIN SUCH EQUIPMENT.

G. THE CRP WILL PROVIDE FOR GAF TRAINING REQUIREMENTS SUCH AS TEMPORARY RESTRICTED AREA (TRA) MONITOR, AIR DEFENSE EXERCISE AREA (ADEXA) PROCEDURES, AND LOW LEVEL ROUTE MONITORING, IF AND WHEN POSSIBLE. MANPOWER TO PERFORM THESE FUNCTIONS WILL BE PROVIDED FROM GAF SOURCES.

2. THE 407L CRP WILL NOT BE RESPONSIBLE FOR THE FOLLOWING FUNCTIONS:

A. PEACETIME IDENTIFICATION OF AIR TRAFFIC, NOT UNDER CONTROL OF THE CRP.

B. THE CRP WILL NOT HAVE SCRAMBLE AUTHORITY UNLESS SPECIFICALLY DELEGATED BY ALLIED SECTOR THREE.

C. SYSTEM MANAGEMENT FUNCTIONS.

D. PRIME RESPONSIBILITY FOR THE REPORTING POSTS (RPS).

E. PROVISION OF FACILITIES FOR GERMAN CIVIL DEFENSE OPERATIONS.

F. ATC INFORMATION SERVICE (INFODIENST). WHILE AUGMENTING, GAF INTERCEPT CONTROLLERS WILL FOLLOW GAF REGULATIONS FOR TRAINING AND EXERCISE MISSIONS.

G. MANAGEMENT OR INTEGRATION OF THE LOW LEVEL RADAR SYSTEM (LLRS).

ARTICLE 4

1. THE MANNING OF THE CRP WILL BE DETERMINED BY THE TCS COMMANDER, SUBJECT TO THE FOLLOWING MINIMUM STANDARDS:

A. A QUALIFIED SENIOR DIRECTOR (SD), AIR SURVEILLANCE OFFICER (ASO), AND A MESSAGE PROCESSING CENTER (MPC) OPERATOR WILL BE ON DUTY AT AL TIMES.

B. WEAPONS CONTROLLER (WC) MANNING WILL BE IAW COMFOURATAF SUPPLAN 34001D (CRP MANNING).

C. MANNING OF THE MCC WILL BE IAW COMFOURATAF SUPPLAN 34001D.

2. TO ACHIEVE OPTIMUM MANNING LEVELS FOR CONTINUOUS OPERATION, THE AUTHORIZED MANNING OF BOTH SQUADRONS MUST BE SUPPLEMENTED. THE MANPOWER REQUIREMENTS ARE DETAILED IN ANNEX B TO THIS AGREEMENT.

A. IT IS FORESEEN THAT THIS MANNING, AS SUPPLEMENTED, IS SUFFICIENT FOR INCREASED READINESS FOR A LIMITED PERIOD OF TIME; SUSTAINED PERIODS OF INCREASED READINESS WILL REQUIRE ADDITIONAL MANNING WHICH WILL BE ARRANGED AMONG THE AFFECTED PARTIES TO THIS AGREEMENT.

B. QUALIFICATION AND SKILL LEVELS OF SUPPLEMENTING PERSONNEL WILL BE DETERMINED BY DIRECT COORDINATION BETWEEN THE TCS AND AGENCIES PROVIDING THESE PERSONNEL, WITH 601 TCW COORDINATION WHEN REQUIRED.

3. THE HOST TCS WILL BE RESPONSIBLE FOR TRAINING ALL AUGMENTATION PERSONNEL ON THE OPERATION OF THE 407L EQUIPMENT AND LOCAL PROCEDURES, BOTH PRIOR TO AND DURING THE AUGMENTATION. THE COMBAT READY CRITERIA FOR GAF AND USAF AUGMENTATION PERSONNEL WILL BE DETERMINED BY THE TCS COMMANDER BASED ON HIS JUDGMENT AND NATIONAL PROCEDURES AND REGULATIONS. THE CHIEF OF THE MCC WILL BE RESPONSIBLE TO THE TCS COMMANDER FOR INSURING MCC PERSONNEL ARE COMBAT READY AND QUALIFIED TO PERFORM DUTIES IN THE MCC BASED ON THE REVISED COMMAND AND CONTROL PROCEDURES.

4. ARRANGEMENTS WILL BE MADE BY THE TCS FOR CONTINUATION TRAINING (PHASE III) OF AUGMENTATION PERSONNEL. TRAINING OPPORTUNITIES WILL BE PROVIDED ON AN EQUAL BASIS TO ALL ASSIGNED PERSONNEL. THE HOST TCS IS AUTHORIZED TO DIRECT TEMPORARY DUTY FOR GERMAN PERSONNEL, WITH PER DIEM AND TRAVEL COSTS TO BE REIMBURSED BY GAF, AFTER COORDINATION WITH THE DISPATCHING GAF ELEMENT.

ARTICLE 5

1. SUPPORT ARRANGEMENTS:

A. GERMAN AUGMENTATION PERSONNEL WILL, AS FAR AS POSSIBLE, BE PROVIDED, ON A REIMBURSABLE BASIS, BILLETING UNDER THE SAME CONDITIONS AS COMPARABLE US PERSONNEL ON TEMPORARY DUTY. EACH INDIVIDUAL OCCUPANT WILL BE RESPONSIBLE FOR PAYING STANDARD SERVICE CHARGES AS PAID BY OTHER BILLETING OCCUPANTS.

B. GERMAN AUGMENTATION PERSONNEL MAY UTILIZE APPROPRIATE US MESSING FACILITIES ON A CASH BASIS AND AT THE SAME PRICE AS FOR US PERSONNEL.

C. AUGMENTATION PERSONNEL WILL BE AFFORDED THE USE OF DUTY CONNECTED TRANSPORTATION AS PROVIDED FOR HOST UNIT PERSONNEL.

D. SUPPLIES USED IN PERFORMING THE OPERATIONAL MISSION (E.G. GREASE PENCILS, RAGS, PAPER, ETC.) WILL BE PROVIDED BY THE HOST UNIT.

E. GERMAN AUGMENTATION PERSONNEL MAY USE THE MORALE, WELFARE, AND RECREATION FACILITIES OF THE HOST UNDER THE SAME CONDITIONS AS MEMBERS OF THE HOST UNIT, SUBJECT TO RESTRICTIONS IMPOSED BY THE FEDERAL REPUBLIC OF GERMANY.

F. LAUNDRY SERVICES WILL BE PROVIDED ON THE SAME BASIS AS FOR US PERSONNEL UPON PAYMENT OF STANDARD CHARGES.

G. MEDICAL AND DENTAL TREATMENT WILL BE PROVIDED WITHIN THE LIMITS OF THE AGREEMENT CONCLUDED BY THE PARTIES ON 4 APRIL 1962 AS WELL AS ARTICLE IX, PARAGRAPH 5 OF THE NATO STATUS OF FORCES AGREEMENT (NATO SOFA).

2. SUPPORT OF US PERSONNEL OTHER THAN USAF PERSONNEL AT USAF UNITS WILL BE COVERED BY AN INTER-SERVICE SUPPORT AGREEMENT (ISSA) PREPARED TO COVER THIS AGREEMENT. HQ USAFE WILL ACT ON BEHALF OF ALL US FORCES FOR BILLING AND REIMBURSEMENT PROCEDURES. ADDITIONAL COST RESULTING FROM THE ISSA WILL BE REIMBURSED BY THE FEDERAL MINISTRY OF DEFENSE OF THE FEDERAL REPUBLIC OF GERMANY.

ARTICLE 6

1. ADDITIONAL COMMUNICATIONS CIRCUITS WILL BE REQUIRED TO CONNECT THE AUGMENTING CRP WITH THE REMAINDER OF THE ADGE DURING THE PERIOD OF AUGMENTATION.

2. THE FEDERAL MINISTRY OF DEFENSE OF THE FEDERAL REPUBLIC OF GERMANY WILL REIMBURSE ALL INCREASED COSTS ATTRIBUTABLE TO COMMUNICATIONS TO SUPPORT THIS AUGMENTATION.

3. CIRCUIT ACTIONS REQUIRED TO DEACTIVATE, REROUTE, OR ACTIVATE CIRCUITS WILL BE ACCOMPLISHED BY THE CIRCUIT DEMANDER.

4. US COMMUNICATIONS ARRANGEMENTS:

A. THE MCC THROUGH THEIR HIGHER HEADQUARTERS WILL PROVIDE UHF VOICE AND ADL CIRCUITS BETWEEN THE CRP LOCATIONS AND THE GROUP TSQ-73 SITES.

B. THE FEDERAL MINISTRY OF DEFENSE OF THE FEDERAL REPUBLIC OF GERMANY WILL REIMBURSE THE COST OF OPERATING ADDITIONAL US UHF SYSTEMS TO EXTEND THE UHF CIRCUITS TO THE NEW LOCATIONS.

C. LANDLINE CIRCUITS REQUIRED BY THE MCC TO MEET US NATIONAL (IE, NON-NATO) REQUIREMENTS WILL BE REQUESTED BY THE MCC AND FUNDED FROM US RESOURCES.

D. PROVISIONS OF EQUIPMENT REQUIRED TO TERMINATE ALL US UHF CIRCUITS AT THE MCC CONSOLES AND STATUS CLERK/EMAS POSITIONS IN THE CRP WILL BE REIMBURSED BY THE FEDERAL MINISTRY OF DEFENSE OF THE FEDERAL REPUBLIC OF GERMANY.

E. USAFE WILL PROVIDE COMMUNICATIONS CENTER CAPABILITY TO AFFORD THE MCC WITH ROUTINE UP THROUGH FLASH CTSA MESSAGE TRAFFIC SERVICES ON SITE. ADDITIONAL COST OF PROVIDING AND MAINTAINING THIS SERVICE WILL BE REIMBURSED BY THE FEDERAL MINISTRY OF DEFENSE OF THE FEDERAL REPUBLIC OF GERMANY

ARTICLE 7

1. ADDITIONAL COSTS INCURRED BY THE US IN SUPPORT OF THIS AUGMENTATION, OVER AND ABOVE NORMAL COSTS, SHALL BE REIMBURSED BY THE FEDERAL MINISTRY OF DEFENSE OF THE FEDERAL REPUBLIC OF GERMANY (SEE ANNEX A FOR DEFINITION).

2. COSTS INCURRED BY THE US WILL BE AGGREGATE ON A QUARTERLY BASIS. THE 601 TCW/ACFMC WILL PREPARE AN INVOICE OF THIS QUARTERLY SUM AND SUBMIT IT TO THE WEHRBEREICHSVERWALTUNG IV, WIESBADEN. THE FEDERAL MINISTRY OF DEFENSE OF THE FEDERAL REPUBLIC OF GERMANY SHALL REIMBURSE 601 TCW/ACFMC, IN US DOLLARS, ON A SEMIANNUAL BASIS AGAINST THESE INVOICES.

3. COST ESTIMATES OF THESE ADDITIONAL COSTS ARE PROVIDED AT ANNEX D.

4. THE PARTIES TO THIS AGREEMENT AGREE TO COOPERATE IN SEEKING NATO INFRASTRUCTURE FUNDING TO ASSIST IN THIS PROJECT.

ARTICLE 8

1. ALL AUGMENTATION PERSONNEL AND PARENT UNIT SUPERVISORY PERSONNEL WILL BE GRANTED ACCESS TO THE CRP SITE IN ORDER TO PERFORM THEIR ASSIGNED DUTIES. THOSE AGENCIES PROVIDING AUGMENTATION PERSONNEL WILL INSURE THAT AN ENTRY ACCESS LIST (EAL) IS PROVIDED TO THE HOST TCS COMMANDER AT LEAST SEVEN DAYS PRIOR TO THE REQUIRED ENTRY DATE AND WILL INSURE THIS LIST IS UPDATED AS CHANGES OCCUR. THE EAL WILL INCLUDE NAME, RANK, IDENTIFICATION NUMBER AND SECURITY CLEARANCE OF ALL PERSONNEL REQUIRING ACCESS. THE HOST UNIT WILL INSURE EACH EAL IS MAINTAINED AT SITE ENTRY POINTS AND WILL AFFORD UNESCORTED ACCESS TO ALL PERSONNEL LISTED THEREON.

2. NORMAL VISITATION PROCEDURES WILL APPLY TO ALL VISITORS TO THE SITES.

3. THE HOST UNIT MAY REQUIRE RESTRICTED ENTRY BADGES TO CONTROL SITE ACCESS. PROVISIONS OF SUCH BADGES WILL BE THE RESPONSIBILITY OF THE HOST UNIT. APPROPRIATE MEASURES FOR SAFEGUARDING SUCH MATERIALS WILL BE OBSERVED BY ALL ASSIGNED AND ATTACHED PERSONNEL.

4. ACCESS WILL NOT BE GRANTED TO CERTAIN NATIONAL SECURITY INFORMATION. THE NATION CONCERNED WILL BE RESPONSIBLE FOR SAFEGUARDING SUCH MATERIAL AND RESTRICTING ACCESS TO IT.

ARTICLE 9

USAFE ACTING AS EXECUTIVE AGENT FOR THIS AGREEMENT ASSURES THAT ALL OTHER US AGENCIES FULFILL OBLIGATIONS NECESSARY TO THE IMPLEMENTATION OF THIS AGREEMENT.

ARTICLE 10

1. THIS AGREEMENT WILL REMAIN IN FORCE UNTIL A WRITTEN TERMINATION IS EXECUTED BY THE SIGNATORIES OR THE DATE OF GEADGE SYSTEM ACCEPTANCE, WHICHEVER OCCURS FIRST. IT MAY BE AMENDED OR SUPPLEMENTED ONLY UPON WRITTEN AGREEMENT OF ALL PARTIES.

2. THIS AGREEMENT IS MADE IN ENGLISH AND GERMAN VERSIONS WHEREBY EACH VERSION IS EQUALLY AUTHENTIC.

BONN,

FOR THE FEDERAL MINISTER OF DEFENSE

DATE 29 AUGUST 1980

DR. GOTZ HERRMANN

MINISTERIALRAT RAMSTEIN, BUFORD D. LARY, BRIG GEN, USAF ASST DCS/OPERATIONS AND INTELLIGENCE (DO) FOR THE COMMANDER-IN-CHIEF UNITED STATES AIR FORCES IN EUROPE DATE 29 AUGUST 1980

LIST OF ANNEXES

ANNEX A TERMS AND DEFINITIONS

ANNEX B PERSONNEL AUGMENTATION

ANNEX C REFERENCES

ANNEX D US COST ESTIMATES

ANNEX A TERMS AND DEFINITIONS

1. CRP - CONTROL AND REPORTING POST. FOR THE PURPOSES OF THIS AUGMENTATION AND WHEN USED IN THIS AGREEMENT, THE TERM CRP WILL REFER TO THE COMPLEX OF CRP, MPC, MCC, AND RADAR/COMMUNICATIONS EQUIPMENT DEDICATED TO THE AIR DEFENSE MISSION.

2. MPC - MESSAGE PROCESSING CENTER. AN/TYC-10, THE EQUIPMENT USED TO INTERFACE THE AUTOMATIC DATA LINK (ADL) OF 412L/GEADGE AND 407L, AMONG OTHERS.

3. MCC - MISSILE CONTROL CENTER.

4. CRC - CONTROL AND REPORTING CENTER.

5. PSA - PROVISIONAL SITE ACCEPTANCE.

6. TCS - TACTICAL CONTROL SQUADRON.

7. SD - SENIOR DIRECTOR. THE 407L POSITION COMPARABLE TO MASTER CONTROLLER (MC) IN THE NADGE.

8. ASO - AIR SURVEILLANCE OFFICER. THE 407L POSITION COMPARABLE TO DISPLAY CONTROLLER (DC) IN THE 412L SYSTEM. NOT TO BE CONFUSED WITH THE SOC ASO WHO IS ASSUMING MDC FUNCTIONS.

9. CONTINUATION TRAINING - THE US TERMS USED TO REFER TO TRAINING PERFORMED TO MAINTAIN PROFICIENCY FOLLOWING INITIAL/ANNUAL QUALIFICATION AND/OR COMBAT READY DECLARATION.

10. WAO - WEAPONS ASSIGNMENT OFFICER. THE 407L POSITION COMPARABLE TO CHIEF INTERCEPT CONTROLLER (CIC) IN THE 412L SYSTEM.

11. NORMAL COSTS - THE OPERATIONS AND MAINTENANCE (O&M) FUNDS BUDGETED BY THE US FOR NORMAL OPERATIONS (FISCAL OPERATING BUDGETS), WHICH ARE ESTIMATES OF COSTS TO BE INCURRED IN NORMAL OPERATION.

12. ADDITIONAL COSTS - ACTUAL US-INCURRED COSTS OVER AND ABOVE NORMAL COSTS, ATTRIBUTED TO THE AUGMENTATION, INCLUDING BUT NOT LIMITED TO INCREASED O&M CONSUMPTION, INCREASED TDY FOR ACTUAL AUGMENTATION, AND INCREASED TDY FOR TRAINING IN SUPPORT OF AUGMENTATION.

13. EMAS - EMERGENCY MESSAGE ACTIONS SYSTEM.

ANNEX B PERSONNEL AUGMENTATION

1. THE US WILL PROVIDE AT LEAST THE FOLLOWING NUMBER AND TYPES OF PERSONNEL:

A. USAFE WILL SUPPLEMENT THE MANNING OF THE CRPS INDICATED, FOR THE ENTIRE PERIOD THE SITE IS AUGMENTING THE ADGE:

  CATEGORY (AFSC)
603 TCS
602 TCS
  AIR WEAPONS CONTROLLER (17XX)
6
0
  AC&W TECHNICIAN (276X0)
14
0
  TELECOMMUNICATIONS OPERATOR (307X0)
3
3
  MAINTENANCE CONTROL (304XX)
5
5
  RADAR MAINTENANCE (303XX)
3
3
  COMPUTER MAINTENANCE (305XX)
1
1
  ESC MAINTENANCE (262XX)
3
3
  RADIO RELAY (304XX)
0
6
  TELETYPE MAINTENANCE (306XX)
3
1
  CRYPTO MAINTENANCE (306XX)
3
1
  AIR CONDITIONING (545XX)
0
1
  REISENBACH RELAY (304XX)
4
4
   
  TOTAL
45
28

B. THE MCC WILL BE MANNED WITH AT LEAST THE FOLLOWING NUMBER AND TYPES OF PERSONNEL TO MAN AND/OR SUPPORT THE MCC FOR THE PERIODS INDICATED: (MODIFIED TABLE)

  CATEGORY (MOS)
603 TCS
ENTIRE PERIOD
602 TCS
15 APR 82 - 1 MAY 83S
  OFFICERS (14A)
5
5
  ADA OPS & INTEL SPEC (16H)
10
10
  UHF OPERATORS (31M)(CRP AND RELAY SITE)
10
13
   
  TOTAL
25
28

2. THE 2ND GE AIR DIV WILL PROVIDE AT LEAST THE FOLLOWING NUMBER AND TYPES OF PERSONNEL TO AUGMENT THE MANNING OF THE 602 TCS, TUERKHEIM FOR THE PERIODS INDICATED:

  CATEGORY
NUMBER
PERIOD
  AC&W OFFICERS
6
15 FEB 82 - 1 MAY 83
  AC&W TECHNICIANS
14
15 FEB 82 - 1 MAY 83
  MCC OFFICERS
3
15 FEB 82 - 15 APR 82
  MCC TECHNICIANS
6
15 FEB 82 - 15 APR 82
   
  TOTAL
29

ANNEX C REFERENCES

1. BONN CONVENTION ON RELATIONS, 23 OCTOBER 1954.

2. AGREEMENT TO SUPPLEMENT THE AGREEMENT BETWEEN THE PARTIES TO THE NORTH ATLANTIC TREATY REGARDING THE STATUS OF THEIR FORCES WITH RESPECT TO FOREIGN FORCES STATIONED IN THE FEDERAL REPUBLIC OF GERMANY (SUPPLEMENTARY AGREEMENT), 3 AUGUST 1959.

3. SHAPE MESSAGE 23565, 3 OCTOBER 1960, STATUS OF GERMAN AIR DEFENSE CONTROLLERS IN PEACETIME.

4. SHAPE LETTER 1250.2/13, 11 JANUARY 1961, RESPONSIBILITY FOR THE APPLICATION OF SACEUR'S RULES OF ENGAGEMENT IN WESTERN GERMANY.

5. TECHNICAL ARRANGEMENT FOR APPLICATION OF SACEUR'S RULES OF ENGAGEMENT DURING PHASE "A" IN TWO AND FOUR ATAF AREAS, 1 APRIL 1962.

6. SACEUR SUPPLAN 10001D, 1251.04/14-9-1/S-133/76, 1 JUNE 1976.

7. MEMORANDUM OF UNDERSTANDING FOR CENTRAL REGION TACTICAL AIR CONTROL SYSTEM INTEGRATION, AAFCE 1528.03/PP/77, 2 MAY 1977.

8. COMFOURATAF SUPPLAN 34001D, 1220.01/0D0-1/S-001/78, 1 MARCH 1978.

9. COMFOURATAF COMMAND INSTRUCTION 90-13, 1 FEBRUARY 1977.

10. COMFOURATAF MESSAGE 301040Z NOVEMBER 1979, AIR DEFENSE REQUIREMENTS DURING TRANSITION TO GEADGE.

11. SACEUR MESSAGE 101500Z MARCH 1980, AIR DEFENSE REQUIREMENTS DURING TRANSITION TO GEADGE.

ANNEX D US COST ESTIMATES

PART I. USAFE

A. DETAILED COST ESTIMATES WERE PROVIDED BY HQ USAFE/DOY LETTER DATED 23 OCTOBER 1980. THESE ESTIMATES HAD BEEN REFINED BASED ON GEADGE WORKING GROUP DISCUSSIONS AND ANALYSIS BY THE 601 TCW. THIS ANNEX WILL NOT REPEAT THE DETAILED ANALYSIS BUT WILL SUMMARIZE THE MAJOR COST ITEMS EXPECTED.

B. THE 603 TCS, MEHLINGEN. NONRADAR ELEMENTS WILL REMAIN IN GARRISON. THE TPS-43E RADAR WILL BE DEPLOYED TO THE FOURATAF SITE AT FISCHBACH WITH THE RADAR SIGNAL REMOTED TO MEHLINGEN BY AN/GSQ-120. THE ORIGINAL ESTIMATES WERE PREPARED FOR A 16 MONTH AUGMENTATION PERIOD. BASED ON THE LATEST GEADGE SCHEDULE, PROVIDED AT THE FIFTH MEETING OF THE GEADGE WORKING GROUP, THE ESTIMATE HAS BEEN PROJECTED FOR AN 18 MONTH PERIOD:

1. TDY COSTS: BASED ON AN AVERAGE CONTINGENT OF 39 PERSONNEL (SIX OFFICERS, 33 ENLISTED PERSONNEL). INCLUDES PER DIEM AND TRAVEL PAY. BASED ON USE OF GOVERNMENT QUARTERS AT SEMBACH AB; AS THESE MAY NOT ALWAYS BE AVAILABLE, CONTRACT QUARTERS WILL INCREASE ACTUAL COSTS:

MONTHLY TDY COST $ 10,496

TOTAL TDY COST FOR 18 MONTHS $ 188,928

2. UTILITY COSTS: BASED ON OPERATION OF SIX ELECTRICAL POWER CONVERTERS AT MEHLINGEN:

MONTHLY UTILITY COST $ 10,735

TOTAL UTILITY COST FOR 18 MONTHS $ 193,230

3. SPARE PARTS AND MISSION SUPPLIES: AN ESTIMATE BASED ON A 50% INCREASE IN CONSUMPTION OF SPARES AND SUPPLIES. FY 1979 AVERAGE DAILY RATE OF SUPPLY CONSUMPTION FOR THE 603 TCS IS $1,800:

MONTHLY SUPPLY COST $ 27,394

TOTAL SUPPLY COST FOR 18 MONTHS $ 493,092

4. FUEL COSTS: CONVERTERS HAVE BEEN INSTALLED AT FISCHBACH. INSTALLATION IS NOT COMPLETE AT MEHLINGEN. UNTIL IT IS COMPLETE THE SITE MUST BE POWERED BY TWO ADDITIONAL MOBILE GENERATORS CONSUME 72 GALLONS OF JP-4 FUEL PER HOUR. THE COST OF JP-4 IS CURRENTLY $1.18 PER GALLON:

MONTHLY FUEL COST $ 62,063

TOTAL FUEL COST FOR 18 MONTHS $ 1,117,134

5. TOTAL COSTS:

TDY $ 188,928

UTILITIES $ 193,230

SUPPLY $ 493,092

FUEL $ 1,117,134

C. THE 602 TCS, TUERKHEIM. BASED ON PLANNED AUGMENTATION PERIOD OF 16 MONTHS:

1. TDY COSTS: BASED ON AN AVERAGE USAF CONTINGENT OF 32 PERSONNEL (ALL ENLISTED):

MONTHLY TDY COST $ 28,665

TOTAL TDY COST FOR 16 MONTHS $ 458,644

2. UTILITY COSTS: BASED ON OPERATION OF SIX CONVERTERS AT TUERKHEIM:

MONTHLY UTILITY COST $ 10,735

TOTAL UTILITY COST FOR 16 MONTHS $ 171,756

3. SPARE PARTS AND MISSION SUPPLIES: ESTIMATED AS FOR 603 TCS:

MONTHLY SUPPLY COST $ 27,394

TOTAL SUPPLY COST FOR 16 MONTHS $ 438,300

4. TOTAL COSTS:

TDY $ 458,644

UTILITIES $ 171,756

SUPPLY $ 438,300

TOTAL $1,068,700

PART II. MCC COST ESTIMATES

A. DETAILED COST ESTIMATES WERE PROVIDED BY 32 AADCOM/AETL-FMD LETTER DATED 15 FEBRUARY 1980. THIS ANNEX WILL NOT REPEAT THE DETAILED ANALYSIS BUT WILL SUMMARIZE THE MAJOR COST ITEMS EXPECTED.

B. MCC MEHLINGEN. US MCC AND COMMUNICATIONS PERSONNEL FROM CRC BOERFINK WILL BE USED FOR THIS AUGMENTATION. THE ORIGINAL ESTIMATE WAS PREPARED FOR A 16 MONTH AUGMENTATION PERIOD. BASED ON THE LATEST GEADGE SCHEDULE, PROVIDED AT THE FIFTH MEETING OF THE GEADGE WORKING GROUP, THE ESTIMATE HAS BEEN PROJECTED FOR AN 18 MONTH PERIOD:

1. TDY COSTS: BASED ON AN AVERAGE CONTINGENT OF 25 PERSONNEL (FIVE OFFICERS, 20 ENLISTED PERSONNEL). INCLUDES SUPERVISORY VISITS AND TRAINING. ALSO INCLUDES PER DIEM AND TRAVEL PAY. BASED ON USE OF GOVERNMENT QUARTERS AT SEMBACH AB; AS THESE MAY NOT ALWAYS BE AVAILABLE, CONTRACT QUARTERS WILL INCREASE ACTUAL COSTS:

MONTHLY TDY COST $ 12,105

TOTAL TDY COST FOR 18 MONTHS $ 217,890

2. UHF COMMUNICATIONS SUPPORT COSTS: BASED ON AN AVERAGE MONTHLY REPAIR AND MAINTENANCE COST FOR A SYSTEM OF $92:

MONTHLY MAINTENANCE AND REPAIR COST $ 368

TOTAL MAINTENANCE AND REPAIR COST FOR 18 MONTHS $ 6,624

3. FUEL COSTS: BASED ON USE OF FOUR GENERATOR SETS WITH A CONSUMPTION RATE OF 10 GALLONS PER HOUR. COST OF FUEL IS $1.26 PER PER GALLON:

MONTHLY FUEL COST $ 9,204

TOTAL FUEL COST FOR 18 MONTHS $ 165,676

4. COMMUNICATIONS EQUIPMENT: COST TO PROVIDE TERMINATING EQUIPMENT AND CIRCUITS TO CONSOLE POSITIONS AT MEHLINGEN:

TOTAL COST $ 8,369

5. TOTAL COSTS:

TDY $ 217,890

MAINTENANCE $ 6,624

FUEL $ 165,676

COMMUNICATIONS $ 8,369

TOTAL $ 398,559

C. MCC TUERKHEIM. US MCC AND COMMUNICATIONS PERSONNEL FROM LAUDA AND/OR WUERZBURG WILL BE USED FOR THIS AUGMENTATION. ORIGINAL ESTIMATE WAS PREPARED FOR A 16 MONTH AUGMENTATION PERIOD. BASED ON THE LATEST GEADGE SCHEDULE, PROVIDED AT THE FIFTH MEETING OF THE GEADGE WORKING GROUP, THE ESTIMATE HAS BEEN REVISED FOR A 13 MONTH PERIOD:

1. TDY COSTS: BASED ON AN AVERAGE CONTINGENT OF 28 PERSONNEL (FIVE OFFICERS, 23 ENLISTED PERSONNEL). INCLUDES SUPERVISORY VISITS AND TRAINING:

MONTHLY TDY COST $ 33,044

TOTAL TDY COST FOR 13 MONTHS $ 429,572

2. UHF COMMUNICATIONS SUPPORT COSTS: BASED ON AN AVERAGE MONTHLY REPAIR AND MAINTENANCE COST FOR A SYSTEM OF $184:

MONTHLY MAINTENANCE AND REPAIR COST $ 736

TOTAL MAINTENANCE AND REPAIR COST FOR 13 MONTHS $ 9,568

3. FUEL COSTS: BASED ON USE OF FOUR GENERATOR SETS:

MONTHLY FUEL COST $ 9,204

TOTAL FUEL COST FOR 13 MONTHS $ 119,652

4. COMMUNICATIONS EQUIPMENT: COST TO PROVIDE TERMINATING EQUIPMENT AND CIRCUITS TO CONSOLE POSITIONS AT TUERKHEIM:

TOTAL COST $ 8,369

5. TOTAL COSTS:

TDY $ 429,572

MAINTENANCE $ 9,568

FUEL $ 119,652

COMMUNICATIONS $ 8,369

TOTAL $ 567,161